Definition of Quality Management -- it is a method for ensuring that all the activities necessary to design, develop and implement a product or service are effective and efficient with respect to the system and its performance. It is also a principle set by the company to endure the continuous advocacy of quality services and products, or the further improvement of it.





Welcome to QT-charts knowledge base section. Hopefully you will find some of them useful in your work.
(Read articles below to learn more.)

Donald Davis, OPERMGMT 345, november 18, 2002

orginal text on http://www.freequality.org

P-CHARTS

            In today’s business world every organization is concerned with quality. Total Quality

Management (TQM) systems use Statistical Process Control (SPC) to insure their operations maintain product quality.        Shortly after World War II, a quality expert and consultant named W. E. Deming was invited to Japan to conduct lectures on improving product reliability. Many experts believe this to be the beginning of Japan’s commitment to TQM.

            It is very difficult to talk about TQM in production management without referring to Statistical Process Control. SPC is a process, which uses control charts to evaluate whether any part of the production process is out of control. The result would be a quality failure or product defection. Its main function is to prevent quality defects before they occur. Many companies spend huge amounts of resources to insure proper training in both TQM and SPC methods.

            Control charts are graphs that reflect a visual diagram to see if sample products remain inside of their control limits. These control charts revolve around two main functions: the first is to establish control limits for the process and the second is to monitor when the production process is outside of these controls.

            P-Chart construction begins with the first step of establishing control limits. There are some assumptions made regarding the discrete attribute measure. The main assumption is while the sample size gets larger, the proportion of defects can be placed into a normal distribution curve. This enables us to use the following statistical formulas to complete the first steps of constructing a P-Chart: establishing the Upper Control Limit (UCL) and Lower Control Limit (LCL).

 

UCL = pbar + zs p

LCL = pbar - zs p

            Where              z = the number of standard deviations from the process average.

                                    pbar = the sample of the proportion that is defective.

                                    s p = the standard deviation of the sample proportion.

            The standard deviation is computed as

 

s p = Öpbar (1 – pbar)/n

            Where n = sample size

            Occasionally you will see a z value of 2.00 but more often than not z is setup as 3.00. This allows a probability of 99.74 percent under normal distribution circumstances.

            Once the Upper and Lower Control Limits are established, it becomes just a matter of plotting the points on a graph or chart to determine the number of defects that exist. Where all plotted points are within the control limits there is a 99.74% comfort level, which exists. If for whatever reason points fall outside the control limits corrective action should be taken to maintain the quality the organization is trying to achieve.

            The following is a typical problem and solution for the construction of a P-Chart:

Twenty samples of n = 200 were taken by an operator at a workstation in a production process. The number of defective items in each sample were recorded as follows.

SAMPLE

NUMBER OF DEFECTIVES

 

p

 

SAMPLE

NUMBER OF DEFECTIVES

 

p

1

12

0.060

11

16

0.080

2

18

0.090

12

14

0.070

3

10

0.050

13

12

0.060

4

14

0.070

14

16

0.080

5

16

0.080

15

18

0.090

6

19

0.095

16

20

0.100

7

17

0.085

17

18

0.090

8

12

0.060

18

20

0.100

9

11

0.055

19

21

0.105

10

14

0.070

20

22

0.110

 

 

 

Management wants to develop a p-chart using 3-sigma limits. Set up the p-chart and plot the observations to determine if the process was out of control at any point.

 

            Solution

            Step 1. Compute pbar:

                        pbar = total # of defectives/total # of observations = 320/(20)(200) = 0.08

            Step 2. Determine the control limits:

                        UCL = pbar + z Ö pbar (1- pbar)/n = 0.08 + (3.00)(0.019) = 0.137

                        LCL = pbar – z Ö pbar (1 – pbar)/n = 0.08 – (3.00)(0.019) = 0.023

            Step 3. Construct the p-chart with pbar = 0.08, UCL = 0.137, and LCL = 0.023. The process does not appear to be out of control.



about us:

Online quality chart generators
Seven basic quality tools online for free. Create your diagrams quick and easy.
Easy to use web interface with powerful editing capabilitie.



NEW:
Your wish was to remove our embedded watermark. So we did that. Our charts are totally free and without watermark.



Join us on facebook, leave your comments




QUICK Menu

Articles about quality
Key Business actors
deming prize
ISO TS 16949 2002
benchmarking
Six Sigma
ABC Analysis
Pay for Learning2
Natural work groups
Quality Circles
Painted Floors in lean
Green Manufacturing
cellular mfg
Five Phase Lean Approach
RunChart
more...